Features
Supervise, control, maintain, support, prove, protect.
Six families, each opened by a production manager's question. Everything included: the licence is chosen by machine tier, not by feature.
Six families
The buyer's question: « What is running, where, and in what state? »
All brands, one screen
13 connector families, normalised states.
Network scan
Finds the printers and recognises them by brand. Nothing is added without your action.
Lost machine, found again
An IP changed? The machine is re-pointed and its history stays.
Camera wall
Every camera in the fleet, live and side by side.
Machine sheet
Camera, live data, print status, history.
Identify a machine
It blinks, then returns to exactly its previous state.
Fleet load
Actual utilisation rate, per machine and over time.
Who frees up when
Forecast from the time left reported by the machine and the duration declared in the file.
Original error codes
The machine's raw code, never an invented sentence.
Missing is not zero
A missing value shows as "unavailable", with its provenance.
Report per print
Tamper-proof, non-editable print report, on a compliance path toward ISO/ASTM 52920.
Alerts and thresholds
A crossed threshold surfaces on screen, acknowledged everywhere at once.
Fleet dashboard
Compliant output, quality, availability and energy in three views, each figure linked to its source.
Room ambience
Air conditioning, air quality, temperature, humidity.
Differential pressure
Pressure cascade between zones, accelerometer, vibrations.
Driven actuators
Air conditioning, compressed air, humidity, with their set points.
Consumption and cost
Fleet electricity, cost estimated at the configured rate.
The buyer's question: « What goes next, and on which machine? »
Production queue
Board, list, history: everything waiting, running or finished.
Three-step drop
Drop, pass the available checks, choose the machine.
Three dispatch modes
Optimised production, balanced wear, or signed manual.
Eligible machines only
Material, capabilities, maintenance, arming: every exclusion has its reason.
Controlled material
Wrong material: the job does not start.
Bed cleared first
Nothing new before the signed harvest.
Automatic re-arming
After a compliant harvest, the machine becomes available again.
Fleet calendar
Maintenance, trials, downtime: work is shifted, never lost.
Workshop hours
Open days, closed days, dated exceptions.
No invisible print
A launch outside DMEOS® is detected and logged.
Segregated ordering parties
Each one sees only their own jobs, enforced by the server.
Notifications and webhooks
Events go out to your tools, when you allow it.
Order closed on good parts
soonIt only ends once the compliant quantity is harvested.
Part-machine quarantine
soonTwo failures: the pair is blocked, maintenance is alerted.
Ambient envelope
soonOut of range, the print waits, then resumes.
The buyer's question: « Which machine needs service before it spoils a part? »
Care learns each machine
Compared with its own history, never with a fleet-wide threshold.
Reliability index
Six components, broken down: you can answer the score.
30-day trend
See a machine degrade before it fails.
Thermal and energy drift
Slower heating, higher consumption: flagged with its measurement.
Comparison across identical machines
For information only, never weighing on the score.
Maintenance rules
Due dates, checklists, a log of every intervention.
Overdue maintenance
The machine leaves dispatch and disarms, with its reason.
Versioned manufacturer programme
Each score stays tied to its version: the history remains enforceable.
Your rules on top
On top of the manufacturer programme, the fleet referent enriches or tightens the maintenance policy, machine by machine.
Preventive, never predictive
We only promise what we measure.
The buyer's question: « Who is allowed to, and how do we help them do it right? »
Named operators
Creation, deactivation, personal code (PIN).
PIN on critical actions
Not on every click: where it matters.
Reserved machines
By capability and by production class.
Zones and groups
Machines laid out like the workshop.
Explained refusal
A readable reason, not an error code.
Risk-free viewing
A read-only phone: see, never act.
GDPR erasure
An operator can be erased, with an information notice.
Per-machine instructions
Distilled over successive prints, at the workstation.
Maintenance manuals
Available next to the machine.
Operator levels
soonThey unlock machine classes.
Qualification
soonIt unlocks machine rights.
Step-by-step assistant
soonFor less experienced operators.
The buyer's question: « How do we prove what left the workshop? »
Archive file per part
Stored where you choose, for every harvested print.
Signed action
Timestamped, traced, never anonymous; signed with the PIN on critical actions.PINRFID · soon
Compliant or scrapped
Each part, through a signed action.
Good parts
We count compliant parts, not finished prints.
Write-only log
Thresholds, states, actions, dispatches: nothing is rewritten.
Air and energy on file
The print conditions stay attached to the part.
Who validated, on what basis
An enforceable answer a year later, not a reconstruction.
Approved documents
soonA document is approved by a signed action before use.
The buyer's question: « What leaves my premises, and who can get in? »
Works offline
No permanent network dependency.
Network posture per channel
Sealed, supervised or connected: every outbound path is decided and provable.
Authorised workstations
Only the workstations on your network that you list can open DMEOS®.
Encrypted extranet
Hosted in France, to supervise remotely.
Offline updates
Verified hash, USB key, name and PIN required. Nothing restarts on its own.
A licence that never cuts off
A unit in service is never stopped by a licence check.
Guided commissioning
A step-by-step assistant and a demo mode.
Hardware hardened by Farm-3D
From the Mini to the ATMN® micro-factory.